Philadelphia Water Department

Stormwater Plan Review Resources

GENERAL INFORMATION

Development Review Process Flowchart
Pre-Application Meeting Form
Project Extension Request Form
Stormwater Plan Review Fees (updated 10/1/2018)

BUILDING PERMIT

How to Obtain Stormwater Sign-Off On A Building Permit Application / Cómo obtener la aprobación de aguas pluviales en una solicitud de Permiso de construcción
PWD Building Permit Sign-Off Checklist / Lista de control de aprobación de permiso de construcción​
Utility Plan Checklist (updated 10/10/2018)
Sample Utility Plan (updated 10/10/2018) 

 

CONCEPTUAL PLAN PREPARATION

Common Mistakes - Conceptual Review Process
ERSA Worksheet (Static Version - Reference Only)
Sample Concept Plan (PDF) (updated 7/5/2016)
Sample E&S Plan (PDF) (updated 7/5/2016)

PCSMP PREPARATION

Common Mistakes - PCSMP Review Process
Construction Certification Package
Infiltration Testing Log
Loading Ratio Requirements One-Sheet
PCSMP Checklists (updated 10/1/2018)
SMP Hierarchy One-Sheet
SMP One-Sheets (all)
Standard Details (all)
Stormwater Plan Review Design Guidance Checklists
Stormwater Plan Review Worksheets (4, & Infiltration Waiver Request Form) (updated 10/1/2018)

CONSTRUCTION

Baseline Monitoring Report
Contractor Resources
Dewatering Detail – Example
E&S FAQ / Preguntas frecuentes sobre erosión y sedimentación (E&S) para contratistas​
Groundwater Discharge Permit Guidance & Application
Record Drawing Requirements (updated 3/9/2016)
Record Drawing Sample
Record Drawing Sample Construction Details
Stormwater Discharge Permit Guidance
Sewer Connection Requirements

OPERATIONS AND MAINTENANCE

Maintenance Guidance One-Sheets
Sample O&M Agreement