- Introduction
- Ch. 1 Stormwater Management Requirements
- Ch. 2 Submission, Review, and Approval Procedures
- Ch. 3 Site Design and Stormwater Management Integration
- Ch. 4 Stormwater Management Practice Guidance
- Ch. 5 Construction Guidance
- Ch. 6 Post-Construction and Operations and Maintenance Guidance
- Appendices
- Download
- Back to Chapters
- Manual Organization and Purpose
- Stormwater Regulations
- Private Development Services
- Stormwater Billing and Incentives
- Stormwater Management in Philadelphia
- Applicability and Submission Process
- Preferred Design Approach
- Back to Chapters
- 1.0 Introduction
- 1.1 Applicability Factors
- 1.2 Stormwater Regulations
- 1.3 Stormwater Retrofits
- Back to Chapter 1
- 1.2.1 Post-Construction Stormwater Management Requirements
- 1.2.2 Erosion and Sediment Control Requirement
- Back to Chapter 1
- 1.3.1 Retrofit Project Applicability and Initiation
- 1.3.2 Retrofit Project Requirements and Guidance
- Back to Chapters
- 2.0 Introduction
- 2.1 Existing Resources and Site Analysis
- 2.2 Review Paths
- 2.3 Review Phases
- 2.4 Expedited Post-Construction Stormwater Management Plan Reviews
- 2.5 PWD’s Development Review Process
- 2.6 PWD’s Role in Philadelphia's Development Process
- 2.7 PWD and Pennsylvania Department of Environmental Protection
- Back to Chapter 2
- 2.2.1 Development Compliance Review Path
- 2.2.2 Development Exemption Review Path
- 2.2.3 Demolition Review Path
- 2.2.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.3.1 Development Compliance Review Path
- 2.3.2 Development Exemption Review Path
- 2.3.3 Demolition Review Path
- 2.3.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.4.1 Disconnection Green Review
- 2.4.2 Surface Green Review
- 2.4.3 Expedited PCSMP Review Process
- Back to Chapter 2
- 2.7.1 National Pollutant Discharge Elimination System Permits
- 2.7.2 Other PA DEP Requirements
- Back to Chapters
- 3.0 Introduction
- 3.1 Site Assessment and Stormwater Management Strategies
- 3.2 Stormwater Management Design
- 3.3 Infiltration Testing and Soil Assessment for SMP Design
- 3.4 How To Show Compliance
- 3.5 Integrated Stormwater Management Examples
- Back to Chapter 3
- 3.0.1 How to Use This Chapter
- 3.0.2 Integrated Site and Stormwater Management Assessment and Design Process Overview
- 3.0.3 Interactions between Design Strategies, Stormwater Regulations, and Review Paths
- Back to Chapter 3
- 3.1.1 Background Site Factors and Site Factors Inventory
- 3.1.2 Site Factors Analysis
- 3.1.3 Integrated Design Approach
- 3.1.4 Non-Structural Design
- 3.1.5 Disconnected Impervious Cover
- 3.1.6 SMP Functions
- 3.1.7 Pollutant- Reducing Practices and Roof Runoff Isolation
- 3.1.8 How to Use SMPs to Comply with the Regulations
- Back to Chapter 3
- 3.2.1 Major SMP Types
- 3.2.2 SMP Hierarchy and Selection Process
- 3.2.3 Placing SMPs in Series
- 3.2.4 Stormwater Management Banking and Trading
- 3.2.5 SMP Design Guidance and General Requirements
- 3.2.6 Loading Ratio Requirements
- 3.2.7 Planting and Vegetation Guidance
- 3.2.8 Operations and Maintenance
- Back to Chapter 3
- 3.3.1 Infiltration Testing and Soil Characterization Plan Development
- 3.3.2 Soil Characterization Requirements
- 3.3.3 Infiltration Testing Requirements
- 3.3.4 Soil Characterization Procedures
- 3.3.5 Infiltration Testing Procedures
- 3.3.6 Evaluation of Infiltration Testing Results
- Back to Chapter 3
- 3.4.1 Regulatory Compliance Documentation Requirements
- 3.4.2 Storm Sewer Design Requirements
- 3.4.3 Calculation Methods and Design Tools
- Back to Chapter 3
- 3.5.1 Commercial Office Building Development
- 3.5.2 Residential Multi-Family Development
- 3.5.3 Full Build-Out
- 3.5.4 Trails
- 3.5.5 Athletic Fields
- 3.5.6 Streets
- Back to Chapters
- 4.0 Introduction
- 4.1 Bioinfiltration/ Bioretention
- 4.2 Porous Pavement
- 4.3 Green Roofs
- 4.4 Subsurface Infiltration
- 4.5 Cisterns
- 4.6 Blue Roofs
- 4.7 Ponds and Wet Basins
- 4.8 Subsurface Detention
- 4.9 Media Filters
- 4.10 Pretreatment
- 4.11 Inlet Controls
- 4.12 Outlet Controls
- Back to Chapter 4
- 4.1.1 Bioinfiltration/ Bioretention Introduction
- 4.1.2 Bioinfiltration/ Bioretention Components
- 4.1.3 Bioinfiltration/ Bioretention Design Standards
- 4.1.4 Bioinfiltration/ Bioretention Material Standards
- 4.1.5 Bioinfiltration/ Bioretention Construction Guidance
- 4.1.6 Bioinfiltration/ Bioretention Maintenance Guidance
- Back to Chapter 4
- 4.2.1 Porous Pavement Introduction
- 4.2.2 Porous Pavement Components
- 4.2.3 Porous Pavement Design Standards
- 4.2.4 Porous Pavement Material Standards
- 4.2.5 Porous Pavement Construction Guidance
- 4.2.6 Porous Pavement Maintenance Guidance
- Back to Chapter 4
- 4.3.1 Green Roof Introduction
- 4.3.2 Green Roof Components
- 4.3.3 Green Roof Design Standards
- 4.3.4 Green Roof Material Standards
- 4.3.5 Green Roof Construction Guidance
- 4.3.6 Green Roof Maintenance Guidance
- Back to Chapter 4
- 4.4.1 Subsurface Infiltration Introduction
- 4.4.2 Subsurface Infiltration Components
- 4.4.3 Subsurface Infiltration Design Standards
- 4.4.4 Subsurface Infiltration Material Standards
- 4.4.5 Subsurface Infiltration Construction Guidance
- 4.4.6 Subsurface Infiltration Maintenance Guidance
- Back to Chapter 4
- 4.5.1 Cistern Introduction
- 4.5.2 Cistern Components
- 4.5.3 Cistern Design Standards
- 4.5.4 Cistern Material Standards
- 4.5.5 Cistern Construction Guidance
- 4.5.6 Cistern Maintenance Guidance
- Back to Chapter 4
- 4.6.1 Blue Roof Introduction
- 4.6.2 Blue Roof Components
- 4.6.3 Blue Roof Design Standards
- 4.6.4 Blue Roof Material Standards
- 4.6.5 Blue Roof Construction Guidance
- 4.6.6 Blue Roof Maintenance Guidance
- Back to Chapter 4
- 4.7.1 Pond and Wet Basin Introduction
- 4.7.2 Pond and Wet Basin Components
- 4.7.3 Pond and Wet Basin Design Standards
- 4.7.4 Pond and Wet Basin Material Standards
- 4.7.5 Pond and Wet Basin Construction Guidance
- 4.7.6 Pond and Wet Basin Maintenance Guidance
- Back to Chapter 4
- 4.8.1 Subsurface Detention Introduction
- 4.8.2 Subsurface Detention Components
- 4.8.3 Subsurface Detention Design Standards
- 4.8.4 Subsurface Detention Material Standards
- 4.8.5 Subsurface Detention Construction Guidance
- 4.8.6 Subsurface Detention Maintenance Guidance
- Back to Chapter 4
- 4.9.1 Media Filter Introduction
- 4.9.2 Media Filter Components
- 4.9.3 Media Filter Design Standards
- 4.9.4 Media Filter Material Standards
- 4.9.5 Media Filter Construction Guidance
- 4.9.6 Media Filter Maintenance Guidance
- Back to Chapter 4
- 4.10.1 Pretreatment Introduction
- 4.10.2 Filter Strips
- 4.10.3 Forebays
- 4.10.4 Swales
- Back to Chapter 4
- 4.11.1 Inlet Control Introduction
- 4.11.2 Flow Splitters
- 4.11.3 Curbless Design/Curb Openings
- 4.11.4 Energy Dissipaters
- 4.11.5 Inlets
- Back to Chapter 4
- 4.12.1 Outlet Control Introduction
- 4.12.2 Orifices
- 4.12.3 Weirs
- 4.12.4 Risers
- 4.12.5 Underdrains
- 4.12.6 Level Spreaders
- 4.12.7 Impervious Liners
- 4.12.8 Micro Siphon Drain Belts
- 4.12.9 Low Flow Devices
- Back to Chapters
- 5.0 Introduction
- 5.1 Construction Inspection
- 5.2 Common Construction Issues
- 5.3 Construction Documentation
- Back to Chapter 5
- 5.1.1 Coordinating Inspections with Other PWD Units
- 5.1.2 Preconstruction Processes
- 5.1.3 Construction Processes
- 5.1.4 Final Inspection
- 5.1.5 Post-Construction Submissions
- Back to Chapter 5
- 5.2.1 Erosion and Sediment-Related Construction Issues
- 5.2.2 Stormwater Management Practice-Related Construction Issues
- Back to Chapters
- 6.0 Introduction
- 6.1 Operations and Maintenance
- 6.2 Stormwater Management Practice Inspection Guidance
- 6.3 Stormwater Credits Program
- Back to Chapter 6
- 6.1.1 Maintenance Requirements for Property Owners
- 6.1.2 Operations and Maintenance Agreements
- Back to Chapters
- Appendix Index
- A. Glossary
- B. Abbreviations
- C. PWD Stormwater Regulations
- D. Watershed Maps
- E. Plan and Report Checklists
- F. Design Guidance Checklists
- G. SMP Maintenance Guide Documents
- H. Infiltration Testing Log
- I. Landscape Guidance
- J. Construction Certification Package
- K. Record Drawing Sample
- L. Standard Details
- Back to Appendices
- Table E-1: General Plan Sheet Requirements
- Table E-2: Existing Conditions Plan Requirements
- Table E-3: Conceptual Stormwater Management Plan Requirements
- Table E-4: Erosion and Sediment Control Plan Requirements
- Table E-5: Standard Erosion and Sediment Control Notes
- Table E-6: Standard Sequence of Construction Notes
- Table E-7: Post-Construction Stormwater Management Plan Report Requirements
- Table E-8: Record Drawing Requirements
- Back to Appendices
- F.1 Stormwater Regulation Compliance
- F.2 Post-Construction Stormwater Management Plan
- F.3 Erosion and Sediment Control
- F.4 Disconnected Impervious Cover
- F.5 Infiltration Testing and Soil Assessment
- F.6 Hydrologic Model and Calculation Methods
- F.7 Bioinfiltration/ Bioretention
- F.8 Porous Pavement
- F.9 Green Roofs
- F.10 Subsurface Infiltration
- F.11 Cisterns
- F.12 Blue Roofs
- F.13 Ponds and Wet Basins
- F.14 Subsurface Detention
- F.15 Media Filters
- F.16 Pretreatment
- F.17 Inlet Controls
- F.18 Outlet Controls
B. Abbreviations
AASHTO |
American Association of State Highway and Transportation Officials |
ANSI |
American National Standards Institute |
ASSE |
American Society of Safety Engineering |
ASTM |
American Society of Testing and Materials |
BMP |
Best Management Practice |
CCP |
Construction Certification Package |
CCTV |
Closed Circuit Television |
CIP |
Cast Iron Pipe |
cfs |
Cubic Feet per Second |
CERCLA |
Comprehensive Environmental Response, Compensation, and Liability Act |
CERM |
Civil Engineering Reference Manual |
CN |
Curve Number |
CO&A |
Consent Order and Agreement |
CSO |
Combined Sewer Overflow |
CWA |
Clean Water Act (1972) |
DCIA |
Directly Connected Impervious Area |
DIC |
Disconnected Impervious Cover |
DOR |
Department of Records |
EMC |
Event Mean Concentration |
EMI |
Electromagnetic Induction |
E&S |
Erosion and Sediment Control |
EPDM |
Ethylene Propylene Diene Terpolymer |
ERSA |
Existing Resources and Site Analysis |
ET |
Evapotranspiration |
FLL |
German Landscape Research, Development and Construction Society |
FEMA |
Federal Emergency Management Agency |
GARP |
Greened Acre Retrofit Program |
GPR |
Ground Penetrating Radar |
GSI |
Green Stormwater Infrastructure |
HDPE |
High-Density Polyethylene |
HOA |
Homeowners Association |
HSG |
Hydrologic Soil Group |
IDF |
Intensity-Duration-Frequency |
IWU |
Industrial Waste Unit |
LEED |
Leadership in Energy and Environmental Design |
L&I |
Department of Licenses and Inspections |
LOD |
Limit of Disturbance |
LTCPU |
Long Term Control Plan Update |
MSC |
Medium Specific Concentration |
MS4 |
Municipal Separate Storm Sewer System |
NJCAT |
New Jersey Center for Advanced Technology |
NJ DEP |
New Jersey Department of Environmental Protection |
NPDES |
National Pollutant Discharge Elimination System |
NOAA |
National Oceanic and Atmospheric Administration |
NOI |
Notice of Intent |
NOT |
Notice of Termination |
NRCS |
Natural Resources Conservation Service |
O&M |
Operations and Maintenance |
OPA |
Office of Property Assessment |
OSHA |
Occupational Safety and Health Administration |
PA DEP |
Pennsylvania Department of Environmental Protection |
PCPC |
Philadelphia City Planning Commission |
PCSM |
Post-Construction Stormwater Management |
PCSMP |
Post-Construction Stormwater Management Plan |
PHS |
Public Health and Safety |
POA |
Point of Analysis |
PUD |
Planned Unit Development |
PVC |
Polyvinyl Chloride |
PWD |
Philadelphia Water Department |
RCP |
Reinforced Concrete Pipe |
ROW |
Right-of-Way |
SIU |
Significant Industrial User |
SMIP |
Stormwater Management Incentive Program |
SMP |
Stormwater Management Practice |
SPLP |
Synthetic Precipitation Leachate Procedure |
SPT |
Standard Penetration Test |
SSPA |
Steep Slope Protection Area |
SWTR |
Surface Water Treatment Rule |
TAPE |
Technology Assessment Protocol - Ecology |
TARP |
Technology Acceptance and Reciprocity Partnership |
TSS |
Total Suspended Solids |
TMDL |
Total Maximum Daily Load |
TPO |
Thermal Polyolefin |
USDA |
United States Department of Agriculture |
USEPA |
United States Environmental Protection Agency |
USGBC |
United States Green Building Council |
USGS |
United States Geological Survey |
VCP |
Vitrified Clay Pipe |
WQv |
Water Quality Volume |
WTR |
Water Transport Records |
WWO |
Wissahickon Watershed Overlay |
ZBA |
Zoning Board of Adjustments |