11/20/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Click here for more infromation on other COVID-19 service changes and be sure to refer to the newsfeed for frequent updates.  Average review times are as follows: Conceptual Reviews: 15 - 20 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

C. PWD Stormwater Regulations

C. PWD Stormwater Regulations

The Philadelphia Water Department (PWD) Stormwater Regulations (Stormwater Regulations), presented in Appendix C, have been developed in accordance with Philadelphia Code §14-704(3), and they consist of four major Post-Construction Stormwater Management Requirements: Water Quality, Channel Protection, Flood Control, and Public Health and Safety Release Rate. In addition, all earth disturbance activity must comply with the Erosion and Sediment Control requirements of the Pennsylvania Department of Environmental Protection, as specified in 25 Pa. Code §102.4.

The objectives of these requirements include:

  • Reduce pollution in runoff
  • Recharge the groundwater table and increase stream base flows
  • Restore more natural site hydrology
  • Reduce combined sewer overflows (CSOs)
  • Reduce the quantity, frequency and duration of CSOs
  • Protect stream channels and banks, fish habitat and infrastructure from erosion and sedimentation
  • Reduce or prevent flooding in areas downstream of development sites

The details of the Stormwater Regulations can be found within Chapter 6: Stormwater of the PWD Regulations: