10/22/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Read here for more infromation on other service changes.  Average review times are as follows: Conceptual Reviews: 20-25 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

D. Watershed Maps

D. Watershed Maps

Watershed location plays an important role in identifying how the Stormwater Regulations, specifically the Post-Construction Stormwater Management Requirements, are applied to a project. Once the location of the development site is determined, Appendix D may be used to evaluate its Flood Management District and sewershed. If they are unable to confirm either, the applicant should contact Stormwater Plan Review. These maps are approximations of sewershed boundaries. The applicant must refer to their project’s point of stormwater discharge when determining which requirements apply to their project.