Table E-1: General Plan Sheet Requirements

Table E-1: General Plan Sheet Requirements

 #  

Each plan sheet submitted to PWD must be legible and include the following items:

1

Project name

2

Revision date(s)

3

Title of plan sheet

4

Signature and seal of Registered Professional (dated) for Final Construction Drawings

5

Plan scale including measurable scale bar (1” = 10’, 20’, 30’, 40’, 50’, 60’, or 100’)
(50’ or less for Record Drawings)

6

North arrow

7

Legend that clearly shows all symbols, line types, and hatchings used on the plan

8

All proposed changes or additions to existing conditions should be represented on the plan in a line weight heavier than that used for existing conditions

9

Street lines, street names, rights-of-way, and easements