11/20/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Click here for more infromation on other COVID-19 service changes and be sure to refer to the newsfeed for frequent updates.  Average review times are as follows: Conceptual Reviews: 15 - 20 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

Table E-1: General Plan Sheet Requirements

Table E-1: General Plan Sheet Requirements

# Each plan sheet submitted to PWD must be legible and include the following items:
1 Project name
2 PWD project tracking number
3 Revision date(s)
4 Title of plan sheet
5 Signature and seal of Registered Professional (dated) for Final Construction Drawings
6 Plan scale including measurable scale bar (1” = 10’, 20’, 30’, 40’, 50’, 60’, or 100’)
(50’ or less for Record Drawings)
7 North arrow
8 Legend that clearly shows all symbols, line types, and hatchings used on the plan
9 All proposed changes or additions to existing conditions should be represented on the plan in a line weight heavier than that used for existing conditions
10 Street lines, street names, rights-of-way, and easements
11 A note indicating the plan’s vertical datum must be included. The Philadelphia Vertical Datum (City Datum) must be used.