- Introduction
- Ch. 1 Stormwater Management Requirements
- Ch. 2 Submission, Review, and Approval Procedures
- Ch. 3 Site Design and Stormwater Management Integration
- Ch. 4 Stormwater Management Practice Guidance
- Ch. 5 Construction Guidance
- Ch. 6 Post-Construction and Operations and Maintenance Guidance
- Appendices
- Download
- Back to Chapters
- Manual Organization and Purpose
- Stormwater Regulations
- Private Development Services
- Stormwater Billing and Incentives
- Stormwater Management in Philadelphia
- Applicability and Submission Process
- Preferred Design Approach
- Back to Chapters
- 1.0 Introduction
- 1.1 Applicability Factors
- 1.2 Stormwater Regulations
- 1.3 Stormwater Retrofits
- Back to Chapter 1
- 1.2.1 Post-Construction Stormwater Management Requirements
- 1.2.2 Erosion and Sediment Control Requirement
- Back to Chapter 1
- 1.3.1 Retrofit Project Applicability and Initiation
- 1.3.2 Retrofit Project Requirements and Guidance
- Back to Chapters
- 2.0 Introduction
- 2.1 Existing Resources and Site Analysis
- 2.2 Review Paths
- 2.3 Review Phases
- 2.4 Expedited Post-Construction Stormwater Management Plan Reviews
- 2.5 PWD’s Development Review Process
- 2.6 PWD’s Role in Philadelphia's Development Process
- 2.7 PWD and Pennsylvania Department of Environmental Protection
- Back to Chapter 2
- 2.2.1 Development Compliance Review Path
- 2.2.2 Development Exemption Review Path
- 2.2.3 Demolition Review Path
- 2.2.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.3.1 Development Compliance Review Path
- 2.3.2 Development Exemption Review Path
- 2.3.3 Demolition Review Path
- 2.3.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.4.1 Disconnection Green Review
- 2.4.2 Surface Green Review
- 2.4.3 Expedited PCSMP Review Process
- Back to Chapter 2
- 2.7.1 National Pollutant Discharge Elimination System Permits
- 2.7.2 Other PA DEP Requirements
- Back to Chapters
- 3.0 Introduction
- 3.1 Site Assessment and Stormwater Management Strategies
- 3.2 Stormwater Management Design
- 3.3 Infiltration Testing and Soil Assessment for SMP Design
- 3.4 How To Show Compliance
- 3.5 Integrated Stormwater Management Examples
- Back to Chapter 3
- 3.0.1 How to Use This Chapter
- 3.0.2 Integrated Site and Stormwater Management Assessment and Design Process Overview
- 3.0.3 Interactions between Design Strategies, Stormwater Regulations, and Review Paths
- Back to Chapter 3
- 3.1.1 Background Site Factors and Site Factors Inventory
- 3.1.2 Site Factors Analysis
- 3.1.3 Integrated Design Approach
- 3.1.4 Non-Structural Design
- 3.1.5 Disconnected Impervious Cover
- 3.1.6 SMP Functions
- 3.1.7 Pollutant- Reducing Practices and Roof Runoff Isolation
- 3.1.8 How to Use SMPs to Comply with the Regulations
- Back to Chapter 3
- 3.2.1 Major SMP Types
- 3.2.2 SMP Hierarchy and Selection Process
- 3.2.3 Placing SMPs in Series
- 3.2.4 Stormwater Management Banking and Trading
- 3.2.5 SMP Design Guidance and General Requirements
- 3.2.6 Loading Ratio Requirements
- 3.2.7 Planting and Vegetation Guidance
- 3.2.8 Operations and Maintenance
- Back to Chapter 3
- 3.3.1 Infiltration Testing and Soil Characterization Plan Development
- 3.3.2 Soil Characterization Requirements
- 3.3.3 Infiltration Testing Requirements
- 3.3.4 Soil Characterization Procedures
- 3.3.5 Infiltration Testing Procedures
- 3.3.6 Evaluation of Infiltration Testing Results
- Back to Chapter 3
- 3.4.1 Regulatory Compliance Documentation Requirements
- 3.4.2 Storm Sewer Design Requirements
- 3.4.3 Calculation Methods and Design Tools
- Back to Chapter 3
- 3.5.1 Commercial Office Building Development
- 3.5.2 Residential Multi-Family Development
- 3.5.3 Full Build-Out
- 3.5.4 Trails
- 3.5.5 Athletic Fields
- 3.5.6 Streets
- Back to Chapters
- 4.0 Introduction
- 4.1 Bioinfiltration/ Bioretention
- 4.2 Porous Pavement
- 4.3 Green Roofs
- 4.4 Subsurface Infiltration
- 4.5 Cisterns
- 4.6 Blue Roofs
- 4.7 Ponds and Wet Basins
- 4.8 Subsurface Detention
- 4.9 Media Filters
- 4.10 Pretreatment
- 4.11 Inlet Controls
- 4.12 Outlet Controls
- Back to Chapter 4
- 4.1.1 Bioinfiltration/ Bioretention Introduction
- 4.1.2 Bioinfiltration/ Bioretention Components
- 4.1.3 Bioinfiltration/ Bioretention Design Standards
- 4.1.4 Bioinfiltration/ Bioretention Material Standards
- 4.1.5 Bioinfiltration/ Bioretention Construction Guidance
- 4.1.6 Bioinfiltration/ Bioretention Maintenance Guidance
- Back to Chapter 4
- 4.2.1 Porous Pavement Introduction
- 4.2.2 Porous Pavement Components
- 4.2.3 Porous Pavement Design Standards
- 4.2.4 Porous Pavement Material Standards
- 4.2.5 Porous Pavement Construction Guidance
- 4.2.6 Porous Pavement Maintenance Guidance
- Back to Chapter 4
- 4.3.1 Green Roof Introduction
- 4.3.2 Green Roof Components
- 4.3.3 Green Roof Design Standards
- 4.3.4 Green Roof Material Standards
- 4.3.5 Green Roof Construction Guidance
- 4.3.6 Green Roof Maintenance Guidance
- Back to Chapter 4
- 4.4.1 Subsurface Infiltration Introduction
- 4.4.2 Subsurface Infiltration Components
- 4.4.3 Subsurface Infiltration Design Standards
- 4.4.4 Subsurface Infiltration Material Standards
- 4.4.5 Subsurface Infiltration Construction Guidance
- 4.4.6 Subsurface Infiltration Maintenance Guidance
- Back to Chapter 4
- 4.5.1 Cistern Introduction
- 4.5.2 Cistern Components
- 4.5.3 Cistern Design Standards
- 4.5.4 Cistern Material Standards
- 4.5.5 Cistern Construction Guidance
- 4.5.6 Cistern Maintenance Guidance
- Back to Chapter 4
- 4.6.1 Blue Roof Introduction
- 4.6.2 Blue Roof Components
- 4.6.3 Blue Roof Design Standards
- 4.6.4 Blue Roof Material Standards
- 4.6.5 Blue Roof Construction Guidance
- 4.6.6 Blue Roof Maintenance Guidance
- Back to Chapter 4
- 4.7.1 Pond and Wet Basin Introduction
- 4.7.2 Pond and Wet Basin Components
- 4.7.3 Pond and Wet Basin Design Standards
- 4.7.4 Pond and Wet Basin Material Standards
- 4.7.5 Pond and Wet Basin Construction Guidance
- 4.7.6 Pond and Wet Basin Maintenance Guidance
- Back to Chapter 4
- 4.8.1 Subsurface Detention Introduction
- 4.8.2 Subsurface Detention Components
- 4.8.3 Subsurface Detention Design Standards
- 4.8.4 Subsurface Detention Material Standards
- 4.8.5 Subsurface Detention Construction Guidance
- 4.8.6 Subsurface Detention Maintenance Guidance
- Back to Chapter 4
- 4.9.1 Media Filter Introduction
- 4.9.2 Media Filter Components
- 4.9.3 Media Filter Design Standards
- 4.9.4 Media Filter Material Standards
- 4.9.5 Media Filter Construction Guidance
- 4.9.6 Media Filter Maintenance Guidance
- Back to Chapter 4
- 4.10.1 Pretreatment Introduction
- 4.10.2 Filter Strips
- 4.10.3 Forebays
- 4.10.4 Swales
- Back to Chapter 4
- 4.11.1 Inlet Control Introduction
- 4.11.2 Flow Splitters
- 4.11.3 Curbless Design/Curb Openings
- 4.11.4 Energy Dissipaters
- 4.11.5 Inlets
- Back to Chapter 4
- 4.12.1 Outlet Control Introduction
- 4.12.2 Orifices
- 4.12.3 Weirs
- 4.12.4 Risers
- 4.12.5 Underdrains
- 4.12.6 Level Spreaders
- 4.12.7 Impervious Liners
- 4.12.8 Micro Siphon Drain Belts
- 4.12.9 Low Flow Devices
- Back to Chapters
- 5.0 Introduction
- 5.1 Construction Inspection
- 5.2 Common Construction Issues
- 5.3 Construction Documentation
- Back to Chapter 5
- 5.1.1 Coordinating Inspections with Other PWD Units
- 5.1.2 Preconstruction Processes
- 5.1.3 Construction Processes
- 5.1.4 Final Inspection
- 5.1.5 Post-Construction Submissions
- Back to Chapter 5
- 5.2.1 Erosion and Sediment-Related Construction Issues
- 5.2.2 Stormwater Management Practice-Related Construction Issues
- Back to Chapters
- 6.0 Introduction
- 6.1 Operations and Maintenance
- 6.2 Stormwater Management Practice Inspection Guidance
- 6.3 Stormwater Credits Program
- Back to Chapter 6
- 6.1.1 Maintenance Requirements for Property Owners
- 6.1.2 Operations and Maintenance Agreements
- Back to Chapters
- Appendix Index
- A. Glossary
- B. Abbreviations
- C. PWD Stormwater Regulations
- D. Watershed Maps
- E. Plan and Report Checklists
- F. Design Guidance Checklists
- G. SMP Maintenance Guide Documents
- H. Infiltration Testing Log
- I. Landscape Guidance
- J. Construction Certification Package
- K. Record Drawing Sample
- L. Standard Details
- Back to Appendices
- Table E-1: General Plan Sheet Requirements
- Table E-2: Existing Conditions Plan Requirements
- Table E-3: Conceptual Stormwater Management Plan Requirements
- Table E-4: Erosion and Sediment Control Plan Requirements
- Table E-5: Standard Erosion and Sediment Control Notes
- Table E-6: Standard Sequence of Construction Notes
- Table E-7: Post-Construction Stormwater Management Plan Report Requirements
- Table E-8: Record Drawing Requirements
- Back to Appendices
- F.1 Stormwater Regulation Compliance
- F.2 Post-Construction Stormwater Management Plan
- F.3 Erosion and Sediment Control
- F.4 Disconnected Impervious Cover
- F.5 Infiltration Testing and Soil Assessment
- F.6 Hydrologic Model and Calculation Methods
- F.7 Bioinfiltration/ Bioretention
- F.8 Porous Pavement
- F.9 Green Roofs
- F.10 Subsurface Infiltration
- F.11 Cisterns
- F.12 Blue Roofs
- F.13 Ponds and Wet Basins
- F.14 Subsurface Detention
- F.15 Media Filters
- F.16 Pretreatment
- F.17 Inlet Controls
- F.18 Outlet Controls
Table E-4: Erosion and Sediment Control Plan Requirements
# | Requirement |
1 | General plan presentation requirements listed in Table E-1 |
2 | Name of owner and designer |
3 | Site address (existing and proposed, if different) |
4 | Location map including site location within watershed(s) |
5 | Property lines, subdivision or lot consolidation lines, all metes, bounds, boundaries, dimensions, building lines and setbacks (if two or more lines (property lines, limits of disturbance (LOD) lines, right-of-way line, etc.) coincide at the same location or over one another on the plan, separate them on additional plan sheets) |
6 | Street lines, street names, lot names, easements, other land divisions, and their purposes and confirmed locations |
7 | Location of boundaries of all existing and proposed rights-of-way, easements, cartway widths for all streets and private roads, and drainage rights-of-way to remain post-construction (any proposed changes to the City plan should also be noted with an ordinance number, if known) |
8 | Location/outline of all existing structures to remain within 25 feet of the limit of disturbance |
9 | Location of all existing utilities (water, sewer, stormwater), including stormwater management practices, to remain above and below ground within 25 feet of the limit of disturbance |
10 | Existing topography of site (contours, sub-basins, etc.) in one-foot contour intervals (minimum) on-site and on adjacent lands within 25 feet of the property line and on the full width of abutting public lands, and private rights-of-way and easement(s) |
11 | Location of all right-of-way encroachments, such as egress wells, stairs, light poles, trees, building overhangs, etc. |
12 | Delineation, labeling, and square footage of the proposed LOD, including all utility connections, sidewalk replacement, stockpiles, and construction entrances within the LOD. The LOD should not only take into consideration proposed improvements, but also areas likely to be disturbed during construction, such as for the installation of erosion and sediment control measures. |
13 | Proposed topography of site (distinguish between existing and proposed contours) in one-foot contour intervals (minimum) |
14 | Identification of all proposed site improvements, such as buildings, basements, parking lots, driveways, landscaping, SMPs, drainage, etc., that should be distinguished from any existing features to remain |
15 | Location and dimensions of all existing and proposed driveways, curb cuts, and off-street parking lots, with distances from lot lines |
16 | Proposed building lines with street setback lines and distances to other existing and proposed buildings if within 15 feet |
17 | Proposed lot lines and lot identification numbers, dimensions, and areas |
18 | Delineation of impervious surfaces |
19 | Location of vegetation identified for preservation and planned landscape areas |
20 | Location of all proposed water and fire utility connections, including proposed sizes, if known
|
21 |
Location of all proposed sanitary sewer and stormwater connections including proposed sizes, if known (sewer connections made directly into inlets and manholes are not permitted) |
22 | Extent and boundaries of 100-year floodplain in relation to the project |
23 | Depiction of post-development hydrology of the site with flow lines and/or drainage areas including discharge points from property and type of discharge (diffused, concentrated, piped, etc.) |
24 | Location of any proposed on-site disposal systems (septic tanks) and drain fields |
25 | Location of all proposed erosion and sediment control measures, including, but not limited to, inlet protection, silt fence and/or compost filter sock, rock filter outlet, rock construction entrance, pumped water filter bag, concrete washout station, and stockpiles, which must be surrounded by silt fencing |
26 | Dimensions of rock construction entrance(s), which must be, at minimum, 50 feet in length and 20 feet in width |
27 | Tree protection fencing around existing trees proposed to remain |
28 | Geotextile or filter stone for erosion protection of soil beneath any proposed riprap |
29 | Objects of considerable mass (i.e. concrete blocks, sand bags, etc.) immediately downslope of any compost socks placed on paved surfaces (at same intervals as recommended by sock manufacturer for stakes) |
30 | The designer must prescribe dust control measures that are appropriate to the project. The designer is referred to the City of Philadelphia Department of Public Health Air Management Services Construction/Demolition/Earthworks Dust Control Requirements FAQ for guidance. |
31 | Standard construction details from the PA DEP Erosion and Sediment Pollution Control Manual (2012 or latest) for inlet protection, silt fence and/or compost filter sock, rock filter outlet, rock construction entrance, pumped water filter bag, concrete washout station, and stockpile location (if any of these erosion and sediment control measures do not apply to the project site, justification must be provided as notes on the plan) |
32 | Standard Erosion and Sediment Control Notes listed in Table E-5, as applicable |
33 | Standard Sequence of Construction Notes listed in Table E-6, as applicable |
34 | Electronic signature and seal of a licensed professional if project's limit of disturbance exceeds 15,000 square feet |