11/20/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Click here for more infromation on other COVID-19 service changes and be sure to refer to the newsfeed for frequent updates.  Average review times are as follows: Conceptual Reviews: 15 - 20 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

G. SMP Maintenance Guide Documents

G. SMP Maintenance Guide Documents

Appendix G contains the SMP Maintenance Guide and its associated documents. An SMP-specific, site-specific SMP Maintenance Guide, prepared by the designer and submitted to, and reviewed by, PWD during the PCSMP Review Phase, should be provided to and implemented by the property owner as a guide for long-term operations and maintenance of the SMPs on-site. SMP Maintenance Guide instructions are available on the first page of the SMP Maintenance Guide to guide the designer through the creation of these items. The SMP Maintenance Guide must be accompanied by a Site Map and a separate Maintenance Schedule Form for each SMP to allow the property owner to track all maintenance activities for their site. SMP Maintenance Guidance One-Sheets are available for each SMP detailed in this Manual in order to provide guidance on SMP maintenance activities and frequencies, including recommended SMP maintenance schedules.