Philadelphia Water Department

Appendices

H. Infiltration Testing Log

H. Infiltration Testing Log

Appendix H contains a template log for documenting infiltration testing results. This Infiltration Testing Log includes guidance for documenting soil characteristics and is required to be completed and submitted as part of the Geotechnical Report during the Post-Construction Stormwater Management Plan Review Phase.

Infiltration Testing Log Template (XLSX)

Infiltration Testing Log Template (PDF)

TOP Manual Version: Version 3.1