11/20/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Click here for more infromation on other COVID-19 service changes and be sure to refer to the newsfeed for frequent updates.  Average review times are as follows: Conceptual Reviews: 15 - 20 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

H. Infiltration Testing Log

H. Infiltration Testing Log

Appendix H contains a template log for documenting infiltration testing results. This Infiltration Testing Log includes guidance for documenting soil characteristics and is required to be completed and submitted as part of the Geotechnical Report during the Post-Construction Stormwater Management Plan Review Phase.