11/20/2020 COVID-19 Service Updates: PWD Headquarters remains closed to the general public. No in-person meetings or document drop offs. Click here for more infromation on other COVID-19 service changes and be sure to refer to the newsfeed for frequent updates.  Average review times are as follows: Conceptual Reviews: 15 - 20 Days; Technical (PCSMP) Reviews: 15-20 Days; Expedited PCSMP Reviews: 5 days; eCLIPSE Stormwater Sign Offs: 10 days.      

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

K. Record Drawing Sample

K. Record Drawing Sample

Along with the Construction Certification Package, the Philadelphia Water Department (PWD) requires that Record Drawing(s) be submitted at the close of the project to ensure that the stormwater management practices (SMPs) and their elements were constructed in general accordance with the Approved Post-Construction Stormwater Management Plan (PCSMP), and to document any field changes. Record Drawing(s) are required for SMP verification and are a key component of PWD’s compliance reporting. Samples which demonstrate how Approved PCSMP plan sheets should be marked-up in order to prepare Record Drawings are provided in Appendix K.