1/7/21 COVID-19 Service Updates: Walk-In Hours will resume VIRTUALLY on January 19, 2021 and continue every Tuesday. Click here for more information on this and other COVID-19 service changes and refer to the newsfeed for frequent updates. Note that PWD Headquarter's are still closed to the general public. No in-person meetings or hand deliveries.  

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

L. Standard Details

L. Standard Details

Typical construction details for several SMPs, including all of PWD’s highest-preference SMPs, such as bioinfiltration/bioretention basins, porous pavement, and green roof, and for SMP-related structures, such as cleanouts, observations wells, and outlet control structures, are available for download in AutoCAD (*.dwg) format in Appendix L. These Standard Details incorporate design specifications pursuant to each SMP’s respective design and material requirements. The designer is encouraged, not required, to use them for PCSMP creation when possible.