In-Person document drop-off requires Pre-Registration. In-Person drop-off will NOT be available on Thursday, May 27. Due to the holiday, pre-registration for Tuesday, June 1 must be received by 4pm on Friday May 28. Refer to the newsfeed for instructions.
L+I Permits require PWD pre-requisite approval. Don't wait! Updates to the real estate tax abatement will take effect January 1, 2022. Refer to this Review Timeline: Tax Abatement Factsheet and the newsfeed for more information. 

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Appendices

L. Standard Details

L. Standard Details

Typical construction details for several SMPs, including all of PWD’s highest-preference SMPs, such as bioinfiltration/bioretention basins, porous pavement, and green roof, and for SMP-related structures, such as cleanouts, observations wells, and outlet control structures, are available for download in AutoCAD (*.dwg) format in Appendix L. These Standard Details incorporate design specifications pursuant to each SMP’s respective design and material requirements. The designer is encouraged, not required, to use them for PCSMP creation when possible.