- Introduction
- Ch. 1 Stormwater Management Requirements
- Ch. 2 Submission, Review, and Approval Procedures
- Ch. 3 Site Design and Stormwater Management Integration
- Ch. 4 Stormwater Management Practice Guidance
- Ch. 5 Construction Guidance
- Ch. 6 Post-Construction and Operations and Maintenance Guidance
- Appendices
- Download
- Back to Chapters
- Manual Organization and Purpose
- Stormwater Regulations
- Private Development Services
- Stormwater Billing and Incentives
- Stormwater Management in Philadelphia
- Applicability and Submission Process
- Preferred Design Approach
- Back to Chapters
- 1.0 Introduction
- 1.1 Applicability Factors
- 1.2 Stormwater Regulations
- 1.3 Stormwater Retrofits
- Back to Chapter 1
- 1.2.1 Post-Construction Stormwater Management Requirements
- 1.2.2 Erosion and Sediment Control Requirement
- Back to Chapter 1
- 1.3.1 Retrofit Project Applicability and Initiation
- 1.3.2 Retrofit Project Requirements and Guidance
- Back to Chapters
- 2.0 Introduction
- 2.1 Existing Resources and Site Analysis
- 2.2 Review Paths
- 2.3 Review Phases
- 2.4 Expedited Post-Construction Stormwater Management Plan Reviews
- 2.5 PWD’s Development Review Process
- 2.6 PWD’s Role in Philadelphia's Development Process
- 2.7 PWD and Pennsylvania Department of Environmental Protection
- Back to Chapter 2
- 2.2.1 Development Compliance Review Path
- 2.2.2 Development Exemption Review Path
- 2.2.3 Demolition Review Path
- 2.2.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.3.1 Development Compliance Review Path
- 2.3.2 Development Exemption Review Path
- 2.3.3 Demolition Review Path
- 2.3.4 Stormwater Retrofit Review Path
- Back to Chapter 2
- 2.4.1 Disconnection Green Review
- 2.4.2 Surface Green Review
- 2.4.3 Expedited PCSMP Review Process
- Back to Chapter 2
- 2.7.1 National Pollutant Discharge Elimination System Permits
- 2.7.2 Other PA DEP Requirements
- Back to Chapters
- 3.0 Introduction
- 3.1 Site Assessment and Stormwater Management Strategies
- 3.2 Stormwater Management Design
- 3.3 Infiltration Testing and Soil Assessment for SMP Design
- 3.4 How To Show Compliance
- 3.5 Integrated Stormwater Management Examples
- Back to Chapter 3
- 3.0.1 How to Use This Chapter
- 3.0.2 Integrated Site and Stormwater Management Assessment and Design Process Overview
- 3.0.3 Interactions between Design Strategies, Stormwater Regulations, and Review Paths
- Back to Chapter 3
- 3.1.1 Background Site Factors and Site Factors Inventory
- 3.1.2 Site Factors Analysis
- 3.1.3 Integrated Design Approach
- 3.1.4 Non-Structural Design
- 3.1.5 Disconnected Impervious Cover
- 3.1.6 SMP Functions
- 3.1.7 Pollutant- Reducing Practices and Roof Runoff Isolation
- 3.1.8 How to Use SMPs to Comply with the Regulations
- Back to Chapter 3
- 3.2.1 Major SMP Types
- 3.2.2 SMP Hierarchy and Selection Process
- 3.2.3 Placing SMPs in Series
- 3.2.4 Stormwater Management Banking and Trading
- 3.2.5 SMP Design Guidance and General Requirements
- 3.2.6 Loading Ratio Requirements
- 3.2.7 Planting and Vegetation Guidance
- 3.2.8 Operations and Maintenance
- Back to Chapter 3
- 3.3.1 Infiltration Testing and Soil Characterization Plan Development
- 3.3.2 Soil Characterization Requirements
- 3.3.3 Infiltration Testing Requirements
- 3.3.4 Soil Characterization Procedures
- 3.3.5 Infiltration Testing Procedures
- 3.3.6 Evaluation of Infiltration Testing Results
- Back to Chapter 3
- 3.4.1 Regulatory Compliance Documentation Requirements
- 3.4.2 Storm Sewer Design Requirements
- 3.4.3 Calculation Methods and Design Tools
- Back to Chapter 3
- 3.5.1 Commercial Office Building Development
- 3.5.2 Residential Multi-Family Development
- 3.5.3 Full Build-Out
- 3.5.4 Trails
- 3.5.5 Athletic Fields
- 3.5.6 Streets
- Back to Chapters
- 4.0 Introduction
- 4.1 Bioinfiltration/ Bioretention
- 4.2 Porous Pavement
- 4.3 Green Roofs
- 4.4 Subsurface Infiltration
- 4.5 Cisterns
- 4.6 Blue Roofs
- 4.7 Ponds and Wet Basins
- 4.8 Subsurface Detention
- 4.9 Media Filters
- 4.10 Pretreatment
- 4.11 Inlet Controls
- 4.12 Outlet Controls
- Back to Chapter 4
- 4.1.1 Bioinfiltration/ Bioretention Introduction
- 4.1.2 Bioinfiltration/ Bioretention Components
- 4.1.3 Bioinfiltration/ Bioretention Design Standards
- 4.1.4 Bioinfiltration/ Bioretention Material Standards
- 4.1.5 Bioinfiltration/ Bioretention Construction Guidance
- 4.1.6 Bioinfiltration/ Bioretention Maintenance Guidance
- Back to Chapter 4
- 4.2.1 Porous Pavement Introduction
- 4.2.2 Porous Pavement Components
- 4.2.3 Porous Pavement Design Standards
- 4.2.4 Porous Pavement Material Standards
- 4.2.5 Porous Pavement Construction Guidance
- 4.2.6 Porous Pavement Maintenance Guidance
- Back to Chapter 4
- 4.3.1 Green Roof Introduction
- 4.3.2 Green Roof Components
- 4.3.3 Green Roof Design Standards
- 4.3.4 Green Roof Material Standards
- 4.3.5 Green Roof Construction Guidance
- 4.3.6 Green Roof Maintenance Guidance
- Back to Chapter 4
- 4.4.1 Subsurface Infiltration Introduction
- 4.4.2 Subsurface Infiltration Components
- 4.4.3 Subsurface Infiltration Design Standards
- 4.4.4 Subsurface Infiltration Material Standards
- 4.4.5 Subsurface Infiltration Construction Guidance
- 4.4.6 Subsurface Infiltration Maintenance Guidance
- Back to Chapter 4
- 4.5.1 Cistern Introduction
- 4.5.2 Cistern Components
- 4.5.3 Cistern Design Standards
- 4.5.4 Cistern Material Standards
- 4.5.5 Cistern Construction Guidance
- 4.5.6 Cistern Maintenance Guidance
- Back to Chapter 4
- 4.6.1 Blue Roof Introduction
- 4.6.2 Blue Roof Components
- 4.6.3 Blue Roof Design Standards
- 4.6.4 Blue Roof Material Standards
- 4.6.5 Blue Roof Construction Guidance
- 4.6.6 Blue Roof Maintenance Guidance
- Back to Chapter 4
- 4.7.1 Pond and Wet Basin Introduction
- 4.7.2 Pond and Wet Basin Components
- 4.7.3 Pond and Wet Basin Design Standards
- 4.7.4 Pond and Wet Basin Material Standards
- 4.7.5 Pond and Wet Basin Construction Guidance
- 4.7.6 Pond and Wet Basin Maintenance Guidance
- Back to Chapter 4
- 4.8.1 Subsurface Detention Introduction
- 4.8.2 Subsurface Detention Components
- 4.8.3 Subsurface Detention Design Standards
- 4.8.4 Subsurface Detention Material Standards
- 4.8.5 Subsurface Detention Construction Guidance
- 4.8.6 Subsurface Detention Maintenance Guidance
- Back to Chapter 4
- 4.9.1 Media Filter Introduction
- 4.9.2 Media Filter Components
- 4.9.3 Media Filter Design Standards
- 4.9.4 Media Filter Material Standards
- 4.9.5 Media Filter Construction Guidance
- 4.9.6 Media Filter Maintenance Guidance
- Back to Chapter 4
- 4.10.1 Pretreatment Introduction
- 4.10.2 Filter Strips
- 4.10.3 Forebays
- 4.10.4 Swales
- Back to Chapter 4
- 4.11.1 Inlet Control Introduction
- 4.11.2 Flow Splitters
- 4.11.3 Curbless Design/Curb Openings
- 4.11.4 Energy Dissipaters
- 4.11.5 Inlets
- Back to Chapter 4
- 4.12.1 Outlet Control Introduction
- 4.12.2 Orifices
- 4.12.3 Weirs
- 4.12.4 Risers
- 4.12.5 Underdrains
- 4.12.6 Level Spreaders
- 4.12.7 Impervious Liners
- 4.12.8 Micro Siphon Drain Belts
- 4.12.9 Low Flow Devices
- Back to Chapters
- 5.0 Introduction
- 5.1 Construction Inspection
- 5.2 Common Construction Issues
- 5.3 Construction Documentation
- Back to Chapter 5
- 5.1.1 Coordinating Inspections with Other PWD Units
- 5.1.2 Preconstruction Processes
- 5.1.3 Construction Processes
- 5.1.4 Final Inspection
- 5.1.5 Post-Construction Submissions
- Back to Chapter 5
- 5.2.1 Erosion and Sediment-Related Construction Issues
- 5.2.2 Stormwater Management Practice-Related Construction Issues
- Back to Chapters
- 6.0 Introduction
- 6.1 Operations and Maintenance
- 6.2 Stormwater Management Practice Inspection Guidance
- 6.3 Stormwater Credits Program
- Back to Chapter 6
- 6.1.1 Maintenance Requirements for Property Owners
- 6.1.2 Operations and Maintenance Agreements
- Back to Chapters
- Appendix Index
- A. Glossary
- B. Abbreviations
- C. PWD Stormwater Regulations
- D. Watershed Maps
- E. Plan and Report Checklists
- F. Design Guidance Checklists
- G. SMP Maintenance Guide Documents
- H. Infiltration Testing Log
- I. Landscape Guidance
- J. Construction Certification Package
- K. Record Drawing Sample
- L. Standard Details
- Back to Appendices
- Table E-1: General Plan Sheet Requirements
- Table E-2: Existing Conditions Plan Requirements
- Table E-3: Conceptual Stormwater Management Plan Requirements
- Table E-4: Erosion and Sediment Control Plan Requirements
- Table E-5: Standard Erosion and Sediment Control Notes
- Table E-6: Standard Sequence of Construction Notes
- Table E-7: Post-Construction Stormwater Management Plan Report Requirements
- Table E-8: Record Drawing Requirements
- Back to Appendices
- F.1 Stormwater Regulation Compliance
- F.2 Post-Construction Stormwater Management Plan
- F.3 Erosion and Sediment Control
- F.4 Disconnected Impervious Cover
- F.5 Infiltration Testing and Soil Assessment
- F.6 Hydrologic Model and Calculation Methods
- F.7 Bioinfiltration/ Bioretention
- F.8 Porous Pavement
- F.9 Green Roofs
- F.10 Subsurface Infiltration
- F.11 Cisterns
- F.12 Blue Roofs
- F.13 Ponds and Wet Basins
- F.14 Subsurface Detention
- F.15 Media Filters
- F.16 Pretreatment
- F.17 Inlet Controls
- F.18 Outlet Controls
5.2 Common Construction Issues
An understanding of common construction issues associated with Erosion and Sediment Control (E&S) measures and stormwater management practices (SMPs) is an important component of effective construction inspections and can help to minimize or avoid these issues. Avoiding these issues streamlines regulatory approval, minimizes negative impacts to the surrounding environment, promotes long-term SMP function, and reduces the cost and duration of construction activities.
5.2.1 Erosion and Sediment-Related Construction Issues
Proper E&S measures are required to keep sediment and pollutants out of existing and proposed sewer systems and, ultimately, Philadelphia’s waterways. The goals of E&S measures are to minimize the amount of erosion that takes place and to keep all sediment accumulation within the earth disturbance boundary. E&S measures are also critical to the protection of existing on-site infrastructure and to reducing the risk of downstream impacts like sediment blockages. Approved E&S measures must be installed and inspected prior to the start of any earth disturbance activities. These E&S measures must be maintained and functional throughout the duration of construction, until the site has been stabilized.
Protection of City-Owned Inlets
Any city-owned inlets that receive stormwater runoff from the construction site must be protected. Contractors need to pay special attention to inlets located at the lowest points, as these will likely receive the most sediment and need to be maintained the most frequently. City-owned inlet protection should not be the primary means of E&S, but an important safeguard to supplement keeping sediment on-site through continuous E&S maintenance, including prevention of sediment tracking off-site.
Additional Erosion and Sediment Issues
Silt fencing must be properly trenched into the ground and backfilled to properly control sediment run-off from any disturbed areas. E&S controls must also be placed around SMP elements to prevent sediment loading from any surrounding unstabilized, disturbed areas. Also, in order to prevent SMP clogging and off-site impacts, all SMP inlets and other on-site inlets must be protected for the full duration of construction activities and until the site has achieved final stabilization. Bioinfiltration/bioretention basins and subsurface infiltration basins may be used as sedimentation basins during construction. The contractor is referred to Section 4.1 and Section 4.4, respectively, for requirements for the use of these SMPs as temporary sediment basins.
5.2.2 Stormwater Management Practice-Related Construction Issues
Compaction or sedimentation within infiltration areas and the use of stone containing fines are among the most common construction issues that can affect the infiltration capacity, and thus the performance and suitability, of an SMP.
Protection of Infiltration Areas
Protection of infiltration areas is important because, with the exception of SMPs designed to function as disconnected impervious cover (DIC), infiltration SMPs are designed based on testing that is performed on undisturbed soils prior to installation. Compaction of these areas could change infiltration rates and cause the SMP to underperform, leading to the need for redesign and/or reconstruction of the SMP. For these reasons, soil compaction should be minimized, even in areas not proposed for infiltration SMPs, to the extent practicable. The best strategy to avoid compaction is to simply avoid equipment traffic within proposed infiltration areas, before, during, and after SMP construction. Where construction equipment traffic is necessary, timber matting or low pressure equipment must be used.
If compaction of infiltration areas is required due to site constraints, the contractor must scarify the ground surface to minimum depths of eight inches for minor compaction and 12 inches for major compaction within the infiltration footprint prior to SMP installation.
Requirements for Protecting Infiltration Areas |
Do not use heavy equipment such as excavators, loaders, or dump trucks within the infiltration area, before or after excavation. Establish heavy equipment exclusion zones so that infiltration areas are clearly protected. Install orange construction fence or silt fence around the exclusion zones. Keep equipment out of the infiltration area to the maximum extent possible. Consider equipment limitations and maneuverability during design to facilitate operation of equipment outside the infiltration area. Do not locate rock construction entrances on top of areas proposed for infiltration practices. |

Use of Clean Stone
Clean-washed stone must be used where indicated by SMP designs. Clean-washed stone must not only be delivered to the site in a clean state, but also stored, moved, and installed in a manner that does not introduce fines. Failure to install appropriately clean stone could impact infiltration performance and require redesign and/or reconstruction. The PWD Inspector may test a sample of stone at any time it is suspected of not meeting required standards. Stone will be tested using the AASHTO T-11 wash loss test and must have less than 0.5% wash loss.
Pipe Loading
Sufficient temporary cover of piping must be provided during all stages of construction, and heavy loads on these pipes must be avoided. Heavy loads can cause separation or damage to the pipe system that, while not necessarily readily apparent, could lead to long-term functionality and maintenance concerns. Any stone placed on top of piping must be placed gently (i.e., not dumped) to avoid these issues.
Inspection and Documentation
The contractor must ensure that all subsurface SMP elements have been inspected and fully documented (survey data, photos, etc.) prior to backfilling these areas to prevent corrective actions that could include re-excavation to affirm correct installation practices.