Effective September 1, 2021: New Rates for Stormwater Plan Review Fees. See https://water.phila.gov/rates/ **** L+I Permits require PWD pre-requisite approval. Don't wait! Updates to the real estate tax abatement will take effect January 1, 2022. Refer to this Review Timeline: Tax Abatement Factsheet. **** Services are still modified as a result of the ongoing pandemic. Refer to Covid-19 Service Updates (version 6) and the newsfeed for the latest information.****

This is an alert about something very important! Please read this important alert about this very important thing!! This is an alert about something very important! Please read this important alert about this very important thing!!

Login Here to Apply

|

Check Status

You are already logged in.

Click here for Project Dashboard

Email is Required.

Password is Required.

Resource Guide

A complete catalogue of all resources available on www.pwdplanreview.org. Note that the more comprehensive information can also be found in the Philadelphia Stormwater Management Guidance Manual.
  Resource Name Resource Type File Type Date Last Modified

1

Common Mistakes - Conceptual Review Process Design .pdf  

2

Common Mistakes – PCSMP Review Process

Design .pdf  

3

Construction Certification Package

Permitting .docx  
4

Discontinuance Permit Requirements

Permitting .pdf  

5

eCLIPSE Prequisite approval processes FAQs (Including PWD)  Permitting Webpage 09/13/2021

6

ERSA Worksheet (Static Version – Reference Only)

Permitting .xlsx  

7

E&S FAQ / Preguntas frecuentes sobre erosión y sedimentación (E&S) para contratistas​

Construction .pdf  
8

Fee In Lieu FAQ

Planning .pdf 12/24/2019

9

Green Inlet Details Sheets 1-9

Design .pdf  

10

Green Inlet Details Sheets 10 -18

Design .pdf  

11

Green Inlet Sample Plan Sheet

Design .pdf  

12

Green Inlet Sample Plan Sheet with Street Crossing

Design .pdf  

13

Green Roof Density Bonus / Proceso de Revisión del Bono de Densidad port Echo Verde

Planning .pdf  

14

Green Roof Tax Credit

Planning .pdf  

15

How to Obtain Stormwater Sign-off on A Building Permit Application

Permitting .pdf  

16

Infiltration Testing Log

Permitting .xlsx  

17

Loading Ratio Requirement One-Sheet

Design .pdf 10/1/2020

18

SMP Maintenance Guidance One-Sheets (ALL)

Maintenance .pdf 10/1/2020
19 SMP Maintenance Guide Maintenance .doc

 

20 Sample SMP Maintenance Guide Site Map Maintenance .pdf

 

21 SMP Maintenance Schedule Forms Maintenance .xlsx

 

22

Pre-Application Meeting Form

Planning .pdf  

23

Proprietary Products

Design Webpage  
24

PWD Building Permit Sign-off Checklist

Permitting .pdf 12/30/2019

25

Record Drawing Requirements

Construction .pdf  

26

Record Drawing Sample

Construction .pdf  

27

Record Drawing Sample Construction Details

Construction .pdf  

28

Sample Concept Plan

Design .pdf  

29

Sample E&S Plan

Design .pdf  

30 

Sample O&M Agreement – Green Roof Density Maintenance pdf 01/27/2021

31

Sample O&M Agreement

Maintenance .pdf 01/27/2021

32

SMP Hierarchy One-Sheet

Design .pdf 10/1/2020

33

SMP One-Sheets (ALL)

Planning .pdf 10/1/2020

34

Standard Details (ALL)

Design .dwg 10/1/2020

35

Stormwater Management Banking and Trading One-Sheet

Design .pdf 10/1/2020

36

Stormwater Management Banking and Trading: Same Parcel Trading One-Sheet

Design .pdf 10/1/2020

37

Street Right-of-Way (ROW) Incentive: Submission and Review Process

Planning .pdf

5/24/2019